26th of July Corridor

This vital roadway connects the heart of Giza (Mohandisseen area of Cairo), Egypt to the Cairo-Alexandria Desert Highway. The project, budgeted at 550 million Egyptian pounds, required the expertise of several different departments within ACE, and had to be executed within a very tight time-frame - only 6 months in 1997-98 for design and construction - for a road having a total length of 15 km and encompassing 28 bridges with different spans.