Extension of a Multi-Purpose Quay, Port Said Port

Port Said city authority planned to extend the multi-purpose quay at Port Said Port and ACE played a role in the project. The extension of the quay had a length of 350 m, supported on tubular steel piles of 70 cm diameter and two lines of sheet piles with tie-rod anchors of 50 m. The water depth in front of the quay has been degreed in the Suez Canal to 14 m.

ACE scope of work: